Handle a weather day

Productions do not get ruined by rain. They get ruined by deciding about rain at six in the morning, with the crew already driving and no plan B that was ever thought through.

What this is about

Weather is the one risk every exterior shoot carries and most quotes ignore. The professional stance treats it as a scheduling variable: which scenes are weather-dependent, what shoots instead if the sky refuses, at what hour the call gets made and by whom. With those four answers written down in prep, a rain forecast becomes a resequencing exercise. Without them it becomes a morning of forty people asking each other what happens now, at full day rate, while the producer negotiates with a radar app.

The order matters more than the tools. Skip a step and you usually notice two steps later — by which point the fix costs several times as much.

What runs differently here

In planning terms, that means:

  • A cover set is only cover if it needs no resources you released: same cast, same location cluster, gear already there
  • The decision deadline is the plan's most valuable line: by 8 p.m. the night before, someone names the version of tomorrow
  • Forecasts are checked at fixed times by one person — a set full of individual weather apps produces anxiety, not information
  • Half-shot exterior scenes are a debt: log precisely what exists, or the pickup day shoots the wrong half

Step by step

This order gets you there fastest:

  1. Mark weather-dependent scenes during scheduling and pair each exterior block with a genuine cover option that uses the people and gear already booked that day.
  2. Write the decision protocol into the plan: who calls it, by when, based on which source. One decider, one deadline, one forecast service — dissent ends there.
  3. Watch the forecast at fixed checkpoints in the days before, and warn the client early that a swap may come. A surprised client on the morning itself hears 'chaos'; a briefed one hears 'plan B'.
  4. When the call goes to cover: resequence the schedule, then notify everyone through one channel with the complete new day — times, locations, what they need to bring. Partial information breeds phone chains.
  5. Renegotiate the moving parts immediately: location slots, gear rental extensions, cast availability for the postponed scenes. The earlier the calls, the cheaper the answers.
  6. Use a genuinely lost day instead of soaking in it: interviews, inserts, prep for tomorrow, the B-roll list that never gets time. A weather day with output stops being a loss.
  7. Log the financial impact the same day — extra rentals, pushed scenes, added travel — while the numbers are fresh and attributable, for the client conversation and the insurance file.
  8. Update the remaining schedule so every postponed scene has a new concrete home. A scene 'we will fit in somewhere' is a scene the wrap party will be missing.

Common pitfalls

What most often goes wrong in practice:

  • Deciding at 6 a.m. in the rain what should have been decided at 8 p.m. in the dry
  • Cover scenes that need an actor who was released yesterday
  • Waiting for the gap in the radar while the whole crew burns billable hours

With TillyGen

Resequencing is where a connected plan earns its keep: swap the day in TillyGen and every touched scene, slot and dependency moves with it, marked — the crew gets one new call sheet instead of eleven corrective texts.

Change one constraint and the consequences travel through the whole plan: affected shots are flagged, the call sheet is regenerated, and nobody keeps working from yesterday's version.

Frequently asked

When is shooting in the rain the better choice?

When the scene tolerates or gains from it and cast, gear and safety are protectable. Wet streets read beautifully on camera; the honest limits are sound, lens protection and cold participants.

Who pays for a lost weather day?

Whatever the contract says — which is why the contract must say something. Weather clauses and, for large exteriors, weather insurance are prep topics; after the rain, only goodwill negotiates.

How long does it take to get started with TillyGen?

A first project takes under an hour to set up. There is no configuration phase in which templates and fields have to be defined before the tool produces anything.

Can the results be exported?

Yes — as PDF for the crew, CSV for downstream systems and through the API for anything automated. The plan stays the source; the exports are views of it.