Video production for the chemical industry
On a chemical site, the safety induction can take longer than the first setup. That is not bureaucracy — it is the condition for being allowed on site at all.
What this is about
Explosion-protection zones decide your equipment list before any creative conversation: standard cameras, phones and radios are banned in Ex areas unless a work permit and gas monitoring make an exception possible. Every crew member gets a safety induction, PPE from helmet to flame-retardant clothing, and an escort who stays for the whole visit. Access windows follow plant reality — turnarounds open areas that are otherwise sealed, and a process that is running cannot be repeated for a second angle. Drone flights need clearance from site security and airspace rules. The plan that works here reads like a permit application first and a shot list second.
Sector routine beats general experience: knowing the field's approval paths and constraints produces more realistic plans than more shoot days without that context.
What runs differently here
In planning terms, that means:
- Ex-zone classifications ban standard electronics — every camera, light and radio on the kit list needs a clearance decision per zone
- Work permits for filming are issued per area and per day, tied to gas measurements and the plant's operational state
- An escort from the site accompanies the crew at all times; their availability is a scheduling constraint like any location
- Turnaround windows are the rare weeks in which closed areas become filmable — and every other contractor wants access at the same time
- Emergency rules override the schedule: alarm drills and muster procedures interrupt takes without discussion
What the plan has to deliver
A production plan is useful to this role when it provides the following:
- A kit list split by Ex zone, with clearance status per item, agreed with site safety
- Induction and escort slots booked into the schedule as fixed appointments
- A scene order that matches area permits, so the crew never waits in front of a sealed unit
Common pitfalls
What most often goes wrong in practice:
- Bringing a drone or wireless kit that site security impounds at the gate
- Planning the shoot outside a turnaround and finding the best motifs sealed
- Underestimating how much shoot time inductions, gowning and escorted transfers consume
With TillyGen
TillyGen structures the plan the way a chemical site thinks — scenes grouped by area and permit, equipment flagged per zone — so the schedule you hand security is one they can approve.
Change one constraint and the consequences travel through the whole plan: affected shots are flagged, the call sheet is regenerated, and nobody keeps working from yesterday's version.
Frequently asked
What camera equipment is allowed in Ex zones?
Only what site safety clears for the specific zone — often nothing standard. The practical routes are filming from outside the zone boundary, using cleared housings, or scheduling shots during a permitted shutdown state.
How much lead time does a chemical plant shoot need?
Think in weeks, not days. Work permits, induction slots, escort availability and equipment clearance each have their own queue, and none of them starts before your kit list is final.
Can we fly a drone over the site?
Only with explicit approval from site security and clearance for the airspace. Many operators refuse overflights of process units entirely and point you to positions outside the fence.
How long does it take to get started with TillyGen?
A first project takes under an hour to set up. There is no configuration phase in which templates and fields have to be defined before the tool produces anything.
Can the results be exported?
Yes — as PDF for the crew, CSV for downstream systems and through the API for anything automated. The plan stays the source; the exports are views of it.