Video production for the public sector

Public sector work starts before the creative call: the scope you can film was written into a tender months ago.

What this is about

The contract shapes the film. Scope, deliverables and often the number of shoot days were fixed in a tender, and adding a location later is a change request rather than a phone call. Inside the building, the press office speaks for the authority and signs off wording line by line; departments contribute content but rarely decide. Citizens are everywhere the work happens — at counters, in waiting areas, on case files and monitors — and none of them came to be in a film, so counter scenes are staged with colleagues or cleared volunteers. Accessibility is not an add-on either: captions, audio description and plain-language versions belong in the scope from the start.

Sector routine beats general experience: knowing the field's approval paths and constraints produces more realistic plans than more shoot days without that context.

What runs differently here

Where this differs from the general case:

  • Scope and shoot days come from the tender documents — a location added after award is handled as a contract change, with the paperwork that implies
  • The press office is the single approving voice; department experts may only speak within wording it has released beforehand
  • Waiting areas, counters and open-plan case work expose citizen data, so those scenes are re-staged with staff or cleared volunteers instead of documented live
  • Accessible versions — captions, audio description, sign language, plain language — are part of the deliverable and change script length and pacing
  • Political neutrality applies to the picture as well: party posters, campaign material and identifiable office holders in the background are removed before rolling

What the plan has to deliver

A production plan is useful to this role when it provides the following:

  • A scene list mapped against the tendered scope, so everyone sees which shots are inside the contract and which are not
  • One named approver in the press office and a written wording status per scene
  • A staging plan for every counter, waiting room and case-file scene, with volunteers briefed and released in advance

Common pitfalls

What most often goes wrong in practice:

  • Designing a concept richer than the tendered scope and negotiating it after award
  • Filming a real service counter and having to blur half the frame afterwards
  • Treating captions and plain-language versions as post-production extras with no budget line

With TillyGen

TillyGen keeps every scene tied to its scope item, approver and accessibility deliverable, so the plan you send the press office is the same document that proves what the contract covers.

Change one constraint and the consequences travel through the whole plan: affected shots are flagged, the call sheet is regenerated, and nobody keeps working from yesterday's version.

Frequently asked

Who actually approves the film?

The press or communications office, even when a department supplied the content. Get one named person, agree how many review rounds the timeline holds, and lock wording before the shoot rather than after the rough cut.

Can we film citizens at a counter?

Not incidentally. Either close the area and stage the scene with briefed volunteers who have signed a release, or shoot from angles where no face, file or screen is identifiable.

What does accessibility mean for the plan?

Captions, an audio-description-friendly pacing, a sign language version and often a plain-language cut. Each one affects script length and framing, so scope them in pre-production instead of retrofitting them at delivery.

How long does it take to get started with TillyGen?

A first project takes under an hour to set up. There is no configuration phase in which templates and fields have to be defined before the tool produces anything.

Can the results be exported?

Yes — as PDF for the crew, CSV for downstream systems and through the API for anything automated. The plan stays the source; the exports are views of it.