TillyGen and Google Drive

Teams that live in Google Workspace keep briefings, contracts and cuts in Drive. TillyGen feeds that structure with plan exports — and the CSV opens one click later in Sheets.

What this is about

Google Drive is more than storage for these teams: shared drives keep ownership with the team instead of a person's account, Docs holds the treatment, Sheets holds every working table, and permissions decide what the client sees. TillyGen sits one step earlier — briefing in, then shot list, storyboard, schedule and call sheet out. The exports land in Drive like any other project file, with one advantage over generic storage: a CSV from TillyGen opens directly in Google Sheets, so every department can sort and filter the plan data without touching the plan itself.

An integration is good when nobody talks about it any more: the data is where it is needed and nobody exports anything.

What runs differently here

Where this differs from the general case:

  • The shot list CSV becomes a filterable Sheet per department — camera sorts by lens, art department filters by set, nobody edits the source
  • Plan PDFs open in the browser preview, so a producer on a phone can check the call sheet without downloading anything
  • A shared drive separates crew and client folders, and the client folder holds approved PDFs only — never internal working exports
  • Feedback arrives as comments on the stored PDF and is carried back into TillyGen as one deliberate change, not scattered edits

Step by step

This order gets you there fastest:

  1. Create a shared drive for the production with separate areas for crew and client, so a wrong share link can never expose internal costs.
  2. Export the plan from TillyGen: PDFs for reading, the shot list additionally as CSV for everyone who wants a sortable view.
  3. Open the CSV in Google Sheets and save department views — filtered by location, by shoot day, by equipment — as working copies, clearly named as such.
  4. Give the client viewer access to approved PDFs only and collect their notes as comments in one place instead of in parallel mail threads.
  5. Carry decisions from those comments back into TillyGen, export fresh, and replace the files — the Sheet views get rebuilt from the new CSV in minutes.

Common pitfalls

What most often goes wrong in practice:

  • A Sheets copy of the shot list that someone starts editing — two weeks later it is a shadow plan that disagrees with TillyGen on eleven rows
  • Permission sprawl: files shared person by person instead of through the drive structure, until nobody knows what the client can actually open

With TillyGen

Drive stores and shares what TillyGen produces; the connected plan — brief to shot list to schedule to call sheet — keeps living in TillyGen. Sheets views are disposable, the plan is not.

Change one constraint and the consequences travel through the whole plan: affected shots are flagged, the call sheet is regenerated, and nobody keeps working from yesterday's version.

Frequently asked

Can the team just plan inside Google Sheets instead?

Sheets is good at tables, but a production plan is connected data: change one scene and shot list, schedule and call sheet all move. That dependency chain is what TillyGen maintains — Sheets shows slices of it.

How current are the CSV views in Drive?

Exactly as current as the last export. Treat them like printed paper: fine for a shoot day, rebuilt from a fresh export after every plan change that matters.

How long does it take to get started with TillyGen?

A first project takes under an hour to set up. There is no configuration phase in which templates and fields have to be defined before the tool produces anything.

Can the results be exported?

Yes — as PDF for the crew, CSV for downstream systems and through the API for anything automated. The plan stays the source; the exports are views of it.