TillyGen and Trello

A two-person crew does not need a project management suite; it needs to see what is open, doing, done. Trello does that — and TillyGen keeps it from having to do more.

What this is about

Trello is kanban at its plainest: boards, lists, cards, drag to move. Small production outfits use it for the operational to-dos around a shoot — book the van, confirm the location owner, charge the batteries, return the lenses. What keeps a Trello board healthy is staying out of planning territory: the moment cards try to encode shooting order or scene dependencies, the board collapses into a puzzle. TillyGen holds that structure instead, and a practical Trello trick bridges the two: paste multiple lines of text into a new card and Trello offers to make one card per line.

An integration is good when nobody talks about it any more: the data is where it is needed and nobody exports anything.

What runs differently here

Where this differs from the general case:

  • Copy rows from the TillyGen CSV, paste them into a Trello list, and accept the one-card-per-line prompt — the to-do board fills itself
  • One checklist per shoot day on a single card beats twenty scattered cards for gear, transport and catering
  • The card 'current plan' holds nothing but the TillyGen link and the latest call sheet PDF — it never moves columns
  • Labels by department let the gaffer filter the board to what concerns the gaffer

Step by step

This order gets you there fastest:

  1. Create a board per production with the classic three lists — to do, doing, done — and resist adding a fourth until it hurts.
  2. Derive operational tasks from the TillyGen plan: everything that must be booked, confirmed, picked up or returned becomes a card.
  3. Use the paste trick for bulk: copy task rows from the exported CSV into a list and confirm one card per line.
  4. Give each shoot day one card with a checklist — call time confirmed, gear packed, route checked — ticked off the evening before.
  5. Keep a pinned-style 'current plan' card holding the TillyGen link and latest call sheet, and renew its attachment whenever the plan changes.

Common pitfalls

What most often goes wrong in practice:

  • The board mutates into a shot list — cards for scenes, cards for shots — and now two structures describe the same shoot differently
  • Done-cards get deleted instead of archived, erasing the only record of who confirmed the location and when

With TillyGen

Trello carries the errands, TillyGen carries the plan that generates them. A card may say 'book the crane for Tuesday' — why Tuesday, and for which shots, is the plan's answer.

Change one constraint and the consequences travel through the whole plan: affected shots are flagged, the call sheet is regenerated, and nobody keeps working from yesterday's version.

Frequently asked

Can Trello import the TillyGen CSV directly?

Not as a built-in board import. The practical route is the paste behavior: copy the task rows as text into a list, and Trello turns each line into a card.

When has a production outgrown Trello?

When cards need due-date chains, dependencies or per-department views to stay useful. The errands can stay in Trello; the structure was in TillyGen all along.

How long does it take to get started with TillyGen?

A first project takes under an hour to set up. There is no configuration phase in which templates and fields have to be defined before the tool produces anything.

Can the results be exported?

Yes — as PDF for the crew, CSV for downstream systems and through the API for anything automated. The plan stays the source; the exports are views of it.