H.264 ALL-I 400 Mbit/s storage requirements

One hour of H.264 ALL-I 400 Mbit/s in UHD at 25p takes 176 GB. The table below runs the numbers for the nominal bitrate and frame rate — including how many cards and how much backup volume a shoot day actually needs.

Footage Storage Calculator

Source (camera/codec)fpsHoursGB
Footage per day
With all copies
Cards needed
Offload time (1 copy)

Data rates: ProRes/DNxHR are per-frame constants from the Apple/Avid specs; RAW derives from resolution × bytes/pixel (nominal). Details further down this page.

H.264 ALL-I 400 Mbit/s: GB per hour

H.264 ALL-I 400 Mbit/s is bitrate-based: data volume follows the configured bitrate, not the resolution. The numbers use the preset's nominal rate.

H.264 ALL-I 400 Mbit/s storage in GB per hour (2026)
Resolution24p25p30p50p60p
UHD 3840×2160169176211352422

From GB to a shoot day

A typical shoot day produces 2–4 hours of footage per camera. At H.264 ALL-I 400 Mbit/s in UHD 25p that is 352–703 GB per camera — before copies. With 3-2-1 backup (three copies) it multiplies to 1.5 TB per three hours of material. The table runs three full shoot-day scenarios:

Shoot-day scenarios with H.264 ALL-I 400 Mbit/s (UHD 25p, one camera)
FootageRaw data1 TB cards3-2-1 volumeOffload per copy (400 MB/s)
2 h352 GB11.03 TB15 min
4 h703 GB12.06 TB30 min
8 h1.37 TB24.12 TB1 h 0 min

Planning offload and backup

Cards are the second calculation: the calculator on the main page derives card count from daily volume and card size — including the spare that stays locked while offloading.

In the schedule this number belongs in two places: as a card budget on the equipment list and as an offload window in the day plan. TillyGen keeps both in the same plan — change the shooting hours and the offload window moves with them.

Frequently asked

How much storage does 1 hour of H.264 ALL-I 400 Mbit/s need?

In UHD at 25p: 176 GB. At 50p, double that. Every resolution is in the table above.

Are the numbers exact?

ProRes/DNxHR are specified target rates; real files land within a few percent. For capacity planning, use the nominal value plus 10 % headroom.