Colour Grading

Colour grading shapes the mood and visual signature of a film on top of a corrected image.

What this is about

Grading starts where correction has finished its work. A colourist decides whether shadows carry a cool cast, how far the contrast is pushed, which colours in the frame are allowed to dominate and which are pulled back. Secondaries isolate parts of the image — a wall, a jacket, a sky — so they can be treated separately, and vignettes or subtle glows steer the eye. The work is only meaningful on a calibrated display in the target colour space, because everything decided here is judged by appearance rather than by measurement.

A term only helps when everyone on set means the same thing by it — so what follows is how it is used, not a dictionary definition.

What runs differently here

Where this differs from the general case:

  • Grading follows correction; a look on an unbalanced image inherits every problem underneath
  • Secondaries isolate individual areas — useful for skies, brand colours and wardrobe
  • Book the session on a calibrated display in the delivery colour space, not on an office monitor

With TillyGen

A grading pass planned as its own step in TillyGen gets a date and an approval round instead of being squeezed into the last evening before delivery.

Change one constraint and the consequences travel through the whole plan: affected shots are flagged, the call sheet is regenerated, and nobody keeps working from yesterday's version.

Frequently asked

When should grading happen in the schedule?

After picture lock. Grading a cut that still changes means paying twice, because every reshuffled shot loses the work already done on it.

How long does it take to get started with TillyGen?

A first project takes under an hour to set up. There is no configuration phase in which templates and fields have to be defined before the tool produces anything.

Can the results be exported?

Yes — as PDF for the crew, CSV for downstream systems and through the API for anything automated. The plan stays the source; the exports are views of it.