Night Shoot
A night shoot is a shooting day whose working hours fall in real darkness rather than in daylight.
What this is about
Three cost blocks show up immediately. Lighting: a package that can fill a street, plus generators, cable runs and the rigging hours before anyone rolls. People: night surcharges, catering at unusual hours, and a crew whose concentration drops in the second half. Neighbours: noise limits, light spill into windows, and complaints that can end a shoot early. On top of that the following day cannot start normally, because turnaround runs from wrap. Schedulers therefore group night days together and put a switch day between the blocks.
A term only helps when everyone on set means the same thing by it — so what follows is how it is used, not a dictionary definition.
What runs differently here
Where this differs from the general case:
- Group night days into a block. Alternating day and night wastes a shooting day each way through turnaround alone.
- Rig in daylight where possible: setting cable and lamps after dark costs roughly double the time and every safety risk doubles too.
- Inform residents and businesses early. A letter and a phone number defuse most of the calls that stop a night shoot.
With TillyGen
TillyGen shows what a night block does to the surrounding days, including the turnaround it forces on the morning after.
Change one constraint and the consequences travel through the whole plan: affected shots are flagged, the call sheet is regenerated, and nobody keeps working from yesterday's version.
Frequently asked
Is day for night cheaper than a real night shoot?
Usually yes, because the lighting package and the surcharges fall away. It only works for scenes where sky, shadows and faces can be controlled.
How long does it take to get started with TillyGen?
A first project takes under an hour to set up. There is no configuration phase in which templates and fields have to be defined before the tool produces anything.
Can the results be exported?
Yes — as PDF for the crew, CSV for downstream systems and through the API for anything automated. The plan stays the source; the exports are views of it.