Rest Period

A rest period is the legally protected stretch of free time between the end of one working day and the start of the next.

What this is about

On a German set this is not a courtesy but the Arbeitszeitgesetz, which sets eleven uninterrupted hours between working days, with sector rules and collective agreements adding their own details for film work. Practically, it is why a wrap at midnight makes an eight o'clock call impossible. The first AD builds the next call sheet from the previous wrap, production checks it before publishing, and a planned exception has to be agreed and compensated rather than discovered. Fatigue is also the largest safety factor on a set that drives, rigs and works at height.

A term only helps when everyone on set means the same thing by it — so what follows is how it is used, not a dictionary definition.

What runs differently here

Where this differs from the general case:

  • Rest period is the entitlement, turnaround is how a production measures and plans it — the two words are not interchangeable.
  • Collective agreements in film modify the detail, so check which agreement a production follows before assuming a number.
  • Freelance contracts do not switch the safety logic off: an exhausted driver at three in the morning is everyone's problem.

With TillyGen

TillyGen warns while planning when a call time would fall inside the rest period of the previous shooting day.

Change one constraint and the consequences travel through the whole plan: affected shots are flagged, the call sheet is regenerated, and nobody keeps working from yesterday's version.

Frequently asked

How long is the rest period under German law?

The Arbeitszeitgesetz requires eleven uninterrupted hours between working days, with defined exceptions and sector rules that a production has to check individually.

How long does it take to get started with TillyGen?

A first project takes under an hour to set up. There is no configuration phase in which templates and fields have to be defined before the tool produces anything.

Can the results be exported?

Yes — as PDF for the crew, CSV for downstream systems and through the API for anything automated. The plan stays the source; the exports are views of it.