Plan a studio shoot
The trade is simple: you pay for control, and you pay with time. Booking the room is the easy part.
What this is about
No weather, no neighbour with a leaf blower, and lights that stay exactly where you put them. What you pay with is hours, and build and strike happen inside them unless a prep day was booked separately. That is where studio days quietly overrun. A white cyc makes it worse because it looks like an empty room and behaves like a set: it wants paint, light from several directions, and real distance between subject and wall. The skill is not choosing a studio, it is booking enough hours around the shooting to make the studio worth having.
The order matters more than the tools. Skip a step and you usually notice two steps later — by which point the fix costs several times as much.
What runs differently here
In planning terms, that means:
- Build, shoot and strike all sit inside the booked hours unless prep is booked separately — the shooting window is shorter than the booking.
- Ceiling height and rigging decide what lighting is possible; a low grid restricts backlight more than floor area restricts the set.
- A cyc needs distance and paint: a subject close to the wall throws shadows that no amount of extra light removes.
- Check power, load-in access and ventilation noise before booking — an air system that cannot be switched off costs you the sound.
Step by step
This order gets you there fastest:
- Define what the studio has to deliver before shortlisting rooms: a cyc, blackout, height for a backlight, space for a set build, or simply a quiet controlled box.
- Visit the room or at least interrogate the details: ceiling height, grid or stands, floor loading, load-in route, lift size and parking for a truck.
- Check power and noise together. Available circuits decide the lighting package, and a ventilation system nobody can switch off decides the audio.
- Book build and strike explicitly, as extra hours or a prep day. Assuming they fit inside the shooting window is the standard way a studio day overruns.
- Order the shooting so heavy setups get built once: group everything on the cyc, then everything on the set, instead of alternating between them.
- Arrange cyc treatment in advance if you need clean white or a specific colour, because painting needs drying time before the crew can work in front of it.
- Keep the subject well off the cyc wall and light for separation, since shadows on a continuous white background are expensive to remove afterwards in post.
- Confirm what the studio provides and what you rent: stands, flags, apple boxes, cleaning, a green room, and who leaves the space as it was found.
Common pitfalls
What most often goes wrong in practice:
- Booking eight hours for a six-hour shoot and losing two of them to a set build nobody scheduled.
- Finding out that the ventilation cannot be switched off during the first interview take.
- Standing talent against the cyc wall and expecting a shadow-free background anyway.
With TillyGen
TillyGen sequences the setups so studio hours are spent shooting instead of rebuilding: everything sharing a lighting state gets grouped before the plan moves on.
Change one constraint and the consequences travel through the whole plan: affected shots are flagged, the call sheet is regenerated, and nobody keeps working from yesterday's version.
Frequently asked
How long should a studio be booked for?
Shooting hours plus build and strike, with load-in and load-out counted honestly. The gap between booked and usable time is where studio days go wrong.
Is a cyc always worth it?
Only when the film needs an unbroken, edge-free background. A cyc costs distance, light and often paint; a plain wall or a large backdrop can be the better trade.
Studio or location?
A studio buys control and repeatability, a location buys context you cannot build. Decide by what the film has to show, then price both options.
How long does it take to get started with TillyGen?
A first project takes under an hour to set up. There is no configuration phase in which templates and fields have to be defined before the tool produces anything.
Can the results be exported?
Yes — as PDF for the crew, CSV for downstream systems and through the API for anything automated. The plan stays the source; the exports are views of it.