Documentary short
You cannot storyboard a documentary short, but you can plan the conditions under which the good moments become likely.
What this is about
A documentary short runs roughly the length of a long song to a short talk and follows a real person, place or process. Its promise is that nothing was staged, which is a production constraint before it is an aesthetic one: no second take, no repeat of the moment that mattered. Where the brand documentary carries a sponsor with interests, the documentary short answers only to its subject, and where the company portrait guides a viewer through facts, this format lets a situation speak. Crews stay tiny — often two or three people, sometimes one — so that a room does not change simply because the film walked in.
The format determines scope, crew and timeline — before the first location has been scouted.
What runs differently here
In planning terms, that means:
- Access is the real budget line: who lets you in, for how long, and what happens when the subject changes their mind mid-shoot
- The plan schedules waiting time on purpose, because the moments that carry the film are the ones nobody could call in advance
- Sound is planned like a fiction shoot even though the visuals are not — a lost sentence cannot be recreated later
- Structure is developed in parallel to shooting: a working outline gets revised after every day so the gaps stay visible
- Consent is an ongoing conversation with people who are not media professionals, not a form signed once at the door
What the plan has to deliver
A production plan is useful to this role when it provides the following:
- A written access agreement covering dates, rooms, third parties in frame and the right to keep filming when things go wrong
- A working outline with the scenes you believe you need and the gaps you are still hunting
- A day plan that reserves observation blocks, not just interview and b-roll slots
Common pitfalls
What most often goes wrong in practice:
- Planning like a corporate shoot: filling every hour, so there is no capacity left when something unexpected starts happening
- Interviewing the subject on day one, before anyone trusts the crew enough to say the interesting sentence
- Assuming an outline is a script and then having no structure at all when reality refuses to follow it
With TillyGen
TillyGen keeps a documentary short organised without over-planning it: access dates, a living scene outline and day plans with reserved observation time, updated as the story changes.
Change one constraint and the consequences travel through the whole plan: affected shots are flagged, the call sheet is regenerated, and nobody keeps working from yesterday's version.
Frequently asked
How many shooting days does a documentary short take?
More than the material suggests. Time is spent building trust and waiting for real situations, so days spread across weeks usually beat one intensive block.
What if the story changes during the shoot?
That is the normal case, and the reason the outline is a working document. Revise it after each day and keep the remaining shoot days flexible enough to follow the better story.
How long does it take to get started with TillyGen?
A first project takes under an hour to set up. There is no configuration phase in which templates and fields have to be defined before the tool produces anything.
Can the results be exported?
Yes — as PDF for the crew, CSV for downstream systems and through the API for anything automated. The plan stays the source; the exports are views of it.