Gaffer
The gaffer turns a lighting concept into rigging time, power and truck space.
What this is about
Light is the slowest thing on set to change. Every lamp that goes up goes up in time the schedule has to contain, and every location decides beforehand how much power, access and rigging that takes.
Every department needs the same plan in a different view. That is exactly where document collections fail: they only ever serve one perspective well.
What runs differently here
In planning terms, that means:
- House power or generator is a scouting answer, not a shoot-day discovery
- A pre-light day moves rigging hours out of the most expensive day of the production
- The plan for a window scene depends on where the sun stands at its scheduled hour
What the plan has to deliver
A production plan is useful to this role when it provides the following:
- Power and load-in facts from the scout, in writing
- Rigging and de-rigging as scheduled blocks, not gaps
- The sun's position at the hour a scene is actually planned
- Order changes flagged before the truck is packed
Common pitfalls
What most often goes wrong in practice:
- Building rigging plans from floor plans without a site visit
- Leaving the biggest relight for the hour with the least daylight margin
With TillyGen
TillyGen turns the shot list into setups with rigging time attached, so the lighting day is planned in real minutes, not in optimism.
Change one constraint and the consequences travel through the whole plan: affected shots are flagged, the call sheet is regenerated, and nobody keeps working from yesterday's version.
Frequently asked
What does the gaffer need from a location scout?
Power situation, load-in path, ceiling height, and where the trucks park relative to set. Four facts that decide half the lighting plan — and that photos cannot show.
When is a pre-light day worth it?
As soon as rigging would otherwise eat the shooting morning. Pre-lighting happens without waiting cast and a full unit — the same work at a different price tag.
Why does the lamp list depend on the schedule?
Because the hour decides what daylight contributes. The same scene in the morning and in the late afternoon is one location with two different lighting packages.
How long does it take to get started with TillyGen?
A first project takes under an hour to set up. There is no configuration phase in which templates and fields have to be defined before the tool produces anything.
Can the results be exported?
Yes — as PDF for the crew, CSV for downstream systems and through the API for anything automated. The plan stays the source; the exports are views of it.