Stylist
Wardrobe depends on casting, fittings and change slots in the day.
What this is about
Wardrobe is the department most dependent on other people's timing. Fittings need cast, cast needs casting, and the number of looks a day can carry is written in the schedule long before it is written on the rack.
Every department needs the same plan in a different view. That is exactly where document collections fail: they only ever serve one perspective well.
What runs differently here
Where this differs from the general case:
- Every wardrobe change on set needs a slot in the day, and slots are schedule currency
- Scenes with rain, food or action need continuity doubles bought before the shoot, not after the first stain
- Patterns that moiré and logos that need clearing are camera problems styling solves in advance
What the plan has to deliver
A production plan is useful to this role when it provides the following:
- Final sizes early enough for fittings and alterations
- Change slots visible in the schedule
- Continuity doubles for messy scenes agreed in prep
- Logo and pattern checks before the shopping day
Common pitfalls
What most often goes wrong in practice:
- Confirming looks before casting is final
- Planning more looks into a day than its schedule has change slots
With TillyGen
TillyGen counts wardrobe changes as schedule items, so the look plan and the day plan agree before the fitting.
Change one constraint and the consequences travel through the whole plan: affected shots are flagged, the call sheet is regenerated, and nobody keeps working from yesterday's version.
Frequently asked
When does styling need final casting?
Early enough for fittings and alterations before the shoot. Sizes bought on guesses come back as safety pins in close-ups.
How many looks fit into one shoot day?
As many as the schedule has change slots for. A change costs shooting time even with a perfect wardrobe crew — the number is a planning decision, not a rack decision.
Why do some garments fail on camera?
Fine patterns moiré against the sensor, pure white clips, visible logos raise clearance questions. All of it is checkable before the shopping day — none of it on set.
How long does it take to get started with TillyGen?
A first project takes under an hour to set up. There is no configuration phase in which templates and fields have to be defined before the tool produces anything.
Can the results be exported?
Yes — as PDF for the crew, CSV for downstream systems and through the API for anything automated. The plan stays the source; the exports are views of it.