Colorist

Grading can match almost anything, at a price set weeks earlier.

What this is about

Footage arrives in the grade carrying every lighting decision the set made. Matching two shots is routine; matching two hundred that were exposed three different ways is a scheduling problem that shows up as suite hours.

Every department needs the same plan in a different view. That is exactly where document collections fail: they only ever serve one perspective well.

What runs differently here

In planning terms, that means:

  • An exterior scene spread across a whole day drifts in color temperature from shot to shot
  • Two different camera models in one scene keep the grade busy longer than any look does
  • A monitoring LUT fixed in prep means the set judges the image the grade will start from

What the plan has to deliver

A production plan is useful to this role when it provides the following:

  • Look references attached to scenes, not sent as a mood mail
  • Exteriors scheduled inside their color-stable window
  • One exposure philosophy across all cameras
  • The monitoring LUT decided during prep

Common pitfalls

What most often goes wrong in practice:

  • Choosing the look after the shoot instead of before it
  • Letting each operator expose to taste on a multi-camera day

With TillyGen

TillyGen keeps look references and shoot days in one plan, so scenes land inside the light window their grade assumes.

Change one constraint and the consequences travel through the whole plan: affected shots are flagged, the call sheet is regenerated, and nobody keeps working from yesterday's version.

Frequently asked

Why does a one-day shoot sometimes need several grading days?

Variance, not length. Mixed light sources, mixed cameras and drifting exteriors create matching work that has nothing to do with how long the shoot ran.

Should the set monitor with the final look?

With a viewing LUT close to it. A set that watches neutral and stylizes later discovers exposure mistakes only when they have become expensive.

What does a second camera model cost in the grade?

Matching work per scene, because sensors render color differently. That is plannable — but only when the camera decision is made before the shoot, not on it.

How long does it take to get started with TillyGen?

A first project takes under an hour to set up. There is no configuration phase in which templates and fields have to be defined before the tool produces anything.

Can the results be exported?

Yes — as PDF for the crew, CSV for downstream systems and through the API for anything automated. The plan stays the source; the exports are views of it.