Director
The director decides what the film is; everything else decides whether it can be shot.
What this is about
The most useful thing a director can get from production is an early, honest answer to "does this fit in the day". Late answers turn creative decisions into damage control.
Every department needs the same plan in a different view. That is exactly where document collections fail: they only ever serve one perspective well.
What runs differently here
Where this differs from the general case:
- Coverage style drives the shot count more than runtime does
- Five shots from one camera position are one setup, not five
- A shot that only works in one light window has to be scheduled first, not last
What the plan has to deliver
A production plan is useful to this role when it provides the following:
- A shot list that shows its own cost in setups
- References that stay attached to the shots they inspired
- Coverage decisions visible as schedule consequences
- Flagging when a creative change breaks a shot downstream
Common pitfalls
What most often goes wrong in practice:
- Deciding vertical deliverables after the shoot
- Approving a shot list without knowing how many setups it implies
With TillyGen
TillyGen writes the shot list from the concept and shows immediately what it costs in setups and days.
Change one constraint and the consequences travel through the whole plan: affected shots are flagged, the call sheet is regenerated, and nobody keeps working from yesterday's version.
Frequently asked
How do I know if my shot list is realistic?
Convert it to setups, not shots, and divide by 12 to 18 per day. If that number surprises you, the list is not realistic yet.
Does a shot list have to be final before the shoot?
It has to be costed, not final. What matters is knowing how many setups it implies — changes on the day are normal, surprises about the setup count are not.
How much does an extra camera position really cost?
One setup, which on a commercial day is between 30 and 50 minutes including relight. Five shots from that one position cost nothing extra; one shot from five positions costs most of an afternoon.
How long does it take to get started with TillyGen?
A first project takes under an hour to set up. There is no configuration phase in which templates and fields have to be defined before the tool produces anything.
Can the results be exported?
Yes — as PDF for the crew, CSV for downstream systems and through the API for anything automated. The plan stays the source; the exports are views of it.