Production Manager
The production manager keeps twenty moving parts from colliding.
What this is about
Crew, gear, locations, permits and transport each have their own lead time. The job is knowing which one becomes the critical path this week.
Every department needs the same plan in a different view. That is exactly where document collections fail: they only ever serve one perspective well.
What runs differently here
In planning terms, that means:
- Permits are granted locally, and processing times differ within the same country
- A company move costs 60 to 120 minutes, of which the drive is the smallest part
- Two moves in one day is where most schedules stop working
What the plan has to deliver
A production plan is useful to this role when it provides the following:
- Every dependency of a change in one view
- Lead times for permits, crew and gear against the same calendar
- Locations with travel time between them, not just addresses
- One distribution list that stays current
Common pitfalls
What most often goes wrong in practice:
- Filing the permit so late that it becomes the condition for the only possible day
- Assuming the grip truck parks where the car does
With TillyGen
TillyGen keeps crew, gear and locations against one schedule, so a change surfaces every dependency it touches.
Change one constraint and the consequences travel through the whole plan: affected shots are flagged, the call sheet is regenerated, and nobody keeps working from yesterday's version.
Frequently asked
When should permits be applied for?
Early enough that a refusal still leaves room for a cover location. If the permit is the condition for the only possible shoot day, it was filed too late.
How long does a company move really take?
60 to 120 minutes, of which the drive is the smallest part. Wrap-out, loading, unloading and re-rigging come to three to five times the travel time.
Which lead time is usually underestimated?
Permits. They are granted locally, processing times differ within the same country, and a refusal arrives too late to find a cover location if the application went out with the shoot already locked.
How long does it take to get started with TillyGen?
A first project takes under an hour to set up. There is no configuration phase in which templates and fields have to be defined before the tool produces anything.
Can the results be exported?
Yes — as PDF for the crew, CSV for downstream systems and through the API for anything automated. The plan stays the source; the exports are views of it.