1st AD

The 1st AD converts a shot list into a day that ends on time.

What this is about

The AD is the only person on set who is paid to think three setups ahead. Everything that makes the day work — order, grouping, when the exterior happens — is decided before the call sheet goes out.

Every department needs the same plan in a different view. That is exactly where document collections fail: they only ever serve one perspective well.

What runs differently here

Where this differs from the general case:

  • The first setup of the day takes about twice as long as the average one
  • A meal break costs 75 to 90 minutes of shooting once the crew resets
  • Camera wrap sits 30 to 45 minutes before crew wrap

What the plan has to deliver

A production plan is useful to this role when it provides the following:

  • Setups grouped by camera position, not by scene order
  • Daylight and blue hour on the day itself, not in a separate app
  • Meal break and company moves already deducted from the shooting time
  • A call sheet that regenerates when the schedule changes

Common pitfalls

What most often goes wrong in practice:

  • Scheduling the most complex setup right after lunch
  • Putting the exterior at the end of a November day

With TillyGen

TillyGen builds the day against real constraints — daylight, moves, turnaround — and flags the setup that no longer fits before you print the call sheet.

Change one constraint and the consequences travel through the whole plan: affected shots are flagged, the call sheet is regenerated, and nobody keeps working from yesterday's version.

Frequently asked

How many setups fit in a ten-hour day?

For a commercial crew, realistically 12 to 18 — not the 30 a shot list often implies. The number drops fast with每 company move.

When should the exterior be scheduled?

As early in the day as the light allows, especially in winter. An exterior at the end of a November day is the first thing an overrun removes.

How long does it take to get started with TillyGen?

A first project takes under an hour to set up. There is no configuration phase in which templates and fields have to be defined before the tool produces anything.

Can the results be exported?

Yes — as PDF for the crew, CSV for downstream systems and through the API for anything automated. The plan stays the source; the exports are views of it.