Line Producer
The line producer makes the budget and the schedule agree with each other.
What this is about
A budget that assumes 18 setups a day and a schedule that delivers 12 are two documents describing different films. Reconciling them late is the most expensive correction in production.
Every department needs the same plan in a different view. That is exactly where document collections fail: they only ever serve one perspective well.
What runs differently here
In planning terms, that means:
- Every schedule change has a number attached, and it is rarely zero
- Travel days at half rate and prep days at full is a five-figure distinction on longer jobs
- Overtime after hour 10 runs at 1.5×, after hour 12 at 2×
What the plan has to deliver
A production plan is useful to this role when it provides the following:
- Budget lines tied to schedule items, not typed twice
- Overtime and turnaround modelled, not estimated afterwards
- Travel and prep days distinguished automatically
- A version history that shows what changed and what it cost
Common pitfalls
What most often goes wrong in practice:
- Building the budget from the wish list instead of the schedule
- Leaving music licensing and archiving out of the number entirely
With TillyGen
Schedule and cost sit in the same model in TillyGen, so moving a scene shows its price immediately.
Change one constraint and the consequences travel through the whole plan: affected shots are flagged, the call sheet is regenerated, and nobody keeps working from yesterday's version.
Frequently asked
Why do budget and schedule drift apart?
Because they are usually maintained in different files by different people. Every change has to be entered twice, and the second entry is the one that gets forgotten.
How are travel days usually billed?
Usually at half rate, prep days at full. Mixing the two up is a five-figure error on longer jobs, and it is the kind that surfaces at final accounting.
What is the most common budgeting error on commercials?
Building the budget from the wish list rather than from the schedule. A budget that assumes 18 setups a day against a schedule that delivers 12 describes a different film, and the difference surfaces at final accounting.
How long does it take to get started with TillyGen?
A first project takes under an hour to set up. There is no configuration phase in which templates and fields have to be defined before the tool produces anything.
Can the results be exported?
Yes — as PDF for the crew, CSV for downstream systems and through the API for anything automated. The plan stays the source; the exports are views of it.